![Daikin RXL25G2V1B Service Manual Download Page 179](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970179.webp)
Outdoor Unit - RXL20G2V1B
SiENBE04-925_A
164
Removal Procedure
2.2
Removal of Electrical Box
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1
Disconnect the 2
connectors for the
reactor.
Preparation
Remove the panels and
disconnect the connector for
the fan motor according to
the “Removal of Outer
Panels / Fan Motor”.
2
Cut the clamps at 2
locations.
3
Disconnect the
connector for the
compressor [S30].
When reassembling, coil the
excessive lead wire and
hang the loop on the hook.
(R9338)
(R9339)
(R9340)
[S30]
SIENBE04-925_A_FRONT.pdf 179
24/02/2011 13:54:05
Summary of Contents for RXL25G2V1B
Page 8: ...SiENBE04 925_A vi Table of Contents ...
Page 14: ...Introduction SiENBE04 925_A xii ...
Page 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Page 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Page 20: ...Specifications SiENBE04 925_A 6 Specifications ...