![Daikin RXL25G2V1B Service Manual Download Page 164](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970164.webp)
SiENBE04-925_A
Indoor Unit
Removal Procedure
149
1.8
Removal of Swing Motors
Procedure
Warning
Be sure to turn off all power supplies at least 10 minutes before
disassembling work.
Step
Procedure
Points
1. Remove the swing motor
for vertical blade.
1
Lift the indoor unit with
a wooden base.
2
Remove the screw
behind the drain hose,
and disconnect the
drain hose.
3
Remove the screw at
the rear, and remove
the screws on the right
and the left side of the
swing motors.
(R10323)
(R10329)
Drain hose
(R10330)
Swing motors
SIENBE04-925_A_FRONT.pdf 164
24/02/2011 13:54:01
Summary of Contents for RXL25G2V1B
Page 8: ...SiENBE04 925_A vi Table of Contents ...
Page 14: ...Introduction SiENBE04 925_A xii ...
Page 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Page 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Page 20: ...Specifications SiENBE04 925_A 6 Specifications ...