
I n s t r u c t i o n s f o r U s e
a n d M a i n t e n a n c e
Section
F
13
Manual stabilisation manoeuvres with HE cross-beams
Manual stabilisation manoeuvres with HE cross-beams
Manual stabilisation manoeuvres with HE cross-beams
Manual stabilisation manoeuvres with HE cross-beams
Manual stabilisation manoeuvres with HE cross-beams
After having assessed the real solidity of the ground where one must work, it is necessary:
A
A
FROM THE INITIAL CONDITION OF
OUTRIGGER COMPLETELY REFRAINED
UNLOCK THE OUTRIGGER:
1) REMOVE THE SAFETY SPLIT PIN
C
;
2) ROUND THE PIVOT “
A
”
LEVER AND SIMULTANEOUSLY,
TRHOUGH THE PROPER HANDLE,
START TO UNTHREAD THE OUTRIGGER.
THE PIVOT “
A
” WILL HAVE
TO BE ROUNDED 180
DEGREES FROM THE
INITIAL CONDITION.
C
A
For version with
HE cross-beams
ATTENTION
With outriggers and beams out of position, the light H3 in the cabin should be on
Summary of Contents for B-LIFT PRO Series
Page 6: ...Instructions for Use and Maintenance Page left empty on purpose...
Page 14: ...Instructions for Use and Maintenance Section A PAGE LEFT EMPTY ON PURPOSE...
Page 36: ...Instructions for Use and Maintenance Section C 6 PAGE LEFT EMPTY ON PURPOSE...
Page 40: ...Instructions for Use and Maintenance Section C 10 PAGE LEFT EMPTY ON PURPOSE...
Page 100: ...Instructions for Useand M a i n t e n a n c e Section F 28 PAGE LAISSEE VOLONTAIREMENT VIDE...
Page 101: ...Section G Anomalies index Troubleshooting 2...
Page 104: ...Instructions for Useand M a i n t e n a n c e Section G 4 Page left empty on purpose...
Page 126: ...22 Section H PAGE INTENTIONALLY BLANK...
Page 127: ...Section index Demolition 2 Elimination 3 Section H1 Maintenance...
Page 130: ...Use and Maintenance instructions 4 Section H PAGE LEFT EMPTY ON PURPOSE...
Page 148: ...4 Section S Instructions for Use and Maintenance PAGE LEFT EMPTY ON PURPOSE...