
1
Section
H
SUB-FRAME SCREW TIGHTENING
TOOL
PLATFORM CONFIGURATION FOR THE OPERATION:
MAINTENANCE:
PERIODIC INTERVENTION
WHO MAKE THE MAINTENANCE
MAINTENANCE
With the stabilizers completely extended
Adjustable torque spanner (manual or electric)
EACH 1 MONTH OR 1000 WORKING HOURS.
WARNING
Do not overcome the indicated torque
AUTHORIZED WORKSHOP
Adjustable torque spanner (electric)
Adjustable torque spanner (manual)
Tightening moments for normal screws
(with ISO metric threading)
1x1,
0,
1
1
0
1
0
0
0
1x1,
1x1,
1x1,
0x,
class 10,
class ,
Reduce M by 10 % when:
- tightening is done with automatic battery wrench
- for GALVANIZED screws
Ø
NOMINAL
SCREW
M=
Tightening moment
(ft lbs)
Summary of Contents for B-LIFT PRO Series
Page 6: ...Instructions for Use and Maintenance Page left empty on purpose...
Page 14: ...Instructions for Use and Maintenance Section A PAGE LEFT EMPTY ON PURPOSE...
Page 36: ...Instructions for Use and Maintenance Section C 6 PAGE LEFT EMPTY ON PURPOSE...
Page 40: ...Instructions for Use and Maintenance Section C 10 PAGE LEFT EMPTY ON PURPOSE...
Page 100: ...Instructions for Useand M a i n t e n a n c e Section F 28 PAGE LAISSEE VOLONTAIREMENT VIDE...
Page 101: ...Section G Anomalies index Troubleshooting 2...
Page 104: ...Instructions for Useand M a i n t e n a n c e Section G 4 Page left empty on purpose...
Page 126: ...22 Section H PAGE INTENTIONALLY BLANK...
Page 127: ...Section index Demolition 2 Elimination 3 Section H1 Maintenance...
Page 130: ...Use and Maintenance instructions 4 Section H PAGE LEFT EMPTY ON PURPOSE...
Page 148: ...4 Section S Instructions for Use and Maintenance PAGE LEFT EMPTY ON PURPOSE...