
Section
H
PAINT COAT CHECK
PLATFORM CONFIGURATION FOR THE OPERATION:
MAINTENANCE:
PERIODIC INTERVENTION
WHO MAKE THE MAINTENANCE
MAINTENANCE
Transport configuration
DAILY
FINAL USER / AUTHORIZED WORKSHOP
All the parts and components of the elevating - working platform are protected
from atmospheric agents by a paint coat or other surface treatment.
An ongoing check of the paint coat should also be performed since, if this is in
good condition, it is one of the best guarantees for the platform's long working life.
In case of damages to the paint coat, restore it immediately
Periodically check the integrity of the protecting surface treatments.
If necessary, restore the treatment.
Summary of Contents for B-LIFT PRO Series
Page 6: ...Instructions for Use and Maintenance Page left empty on purpose...
Page 14: ...Instructions for Use and Maintenance Section A PAGE LEFT EMPTY ON PURPOSE...
Page 36: ...Instructions for Use and Maintenance Section C 6 PAGE LEFT EMPTY ON PURPOSE...
Page 40: ...Instructions for Use and Maintenance Section C 10 PAGE LEFT EMPTY ON PURPOSE...
Page 100: ...Instructions for Useand M a i n t e n a n c e Section F 28 PAGE LAISSEE VOLONTAIREMENT VIDE...
Page 101: ...Section G Anomalies index Troubleshooting 2...
Page 104: ...Instructions for Useand M a i n t e n a n c e Section G 4 Page left empty on purpose...
Page 126: ...22 Section H PAGE INTENTIONALLY BLANK...
Page 127: ...Section index Demolition 2 Elimination 3 Section H1 Maintenance...
Page 130: ...Use and Maintenance instructions 4 Section H PAGE LEFT EMPTY ON PURPOSE...
Page 148: ...4 Section S Instructions for Use and Maintenance PAGE LEFT EMPTY ON PURPOSE...