
I n s t r u c t i o n s f o r U s e
a n d M a i n t e n a n c e
NECESSARY CONDITIONS TO PLATFORM'S LIFE
The platform has been manufactured to bear 100.000 working cycles under heavy charge
conditions (for ex. 10 years, 50 weeks for years, 40 hours for week, 5 cycles for hour).
Before the end of each working cycle, the platform needs to be carely inspected and
overhauled by the manufacturer.
If the utilisation was particulary heavy, the check-up should be done by closer break times.
The recommended inspection's break time is about 1.000 hours; the overhauling break
time is about 7.000 hours.
ORIGINAL SPARE PARTS
Any tampering and/or replacing components with non original (cte) spare parts will
bring about the conditions for warranty cancellation and may seriously jeopardise
operator safety.
Summary of Contents for B-LIFT PRO Series
Page 6: ...Instructions for Use and Maintenance Page left empty on purpose...
Page 14: ...Instructions for Use and Maintenance Section A PAGE LEFT EMPTY ON PURPOSE...
Page 36: ...Instructions for Use and Maintenance Section C 6 PAGE LEFT EMPTY ON PURPOSE...
Page 40: ...Instructions for Use and Maintenance Section C 10 PAGE LEFT EMPTY ON PURPOSE...
Page 100: ...Instructions for Useand M a i n t e n a n c e Section F 28 PAGE LAISSEE VOLONTAIREMENT VIDE...
Page 101: ...Section G Anomalies index Troubleshooting 2...
Page 104: ...Instructions for Useand M a i n t e n a n c e Section G 4 Page left empty on purpose...
Page 126: ...22 Section H PAGE INTENTIONALLY BLANK...
Page 127: ...Section index Demolition 2 Elimination 3 Section H1 Maintenance...
Page 130: ...Use and Maintenance instructions 4 Section H PAGE LEFT EMPTY ON PURPOSE...
Page 148: ...4 Section S Instructions for Use and Maintenance PAGE LEFT EMPTY ON PURPOSE...