CRS-500 1:N Redundancy System
Revision 4
Installation
4–1
MN-CRS-500
Chapter 4. INSTALLATION
4.1
Unpack and Inspect the Shipment
THIS EQUIPMENT CONTAINS PARTS AND ASSEMBLIES SENSITIVE TO DAMAGE BY
ELECTROSTATIC DISCHARGE (ESD). USE ESD PRECAUTIONARY PROCEDURES
WHEN HANDLING THE EQUIPMENT
.
Figure 4-1. Unpack and Inspect the Shipment
The components of the CRS-500 1:N Redundancy System, the optional Installation and
Operation Manual (otherwise available online at http://www.comtechefdata.com), and the CSU
power cords were packaged and shipped in reusable cardboard cartons containing protective
foam spacing (Figure 4-1).
Summary of Contents for CRS-500
Page 24: ...CRS 500 1 N Redundancy System Revision 4 Preface x MN CRS 500 Notes...
Page 38: ...CRS 500 1 N Redundancy System Revision 4 Introduction 1 14 MN CRS 500 BLANK PAGE...
Page 60: ...CRS 500 1 N Redundancy System Revision 4 Installation 4 6 MN CRS 500 BLANK PAGE...
Page 219: ......
Page 220: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX...