19-60
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 19 DLPs D200 to D299
DLP- D255 Cross-Connect Card Side Switch Test
Step 9
After the node icon turns green (within 1 to 2 minutes), double-click it. On the shelf graphic, observe
the following:
•
The previous standby TCC2/TCC2P card has a green ACT LED.
•
The previous active TCC2/TCC2P card LEDs go through the following LED sequence: NP (card not
present), Ldg (software is loading), amber SBY LED (TCC2/TCC2P card is in standby mode). The
LEDs should complete this sequence within 5 to 10 minutes.
Step 10
Verify that traffic on the test set connected to the node is still running. If a traffic interruption occurs, do
not continue, refer to your next level of support.
Step 11
through
to return the active/standby TCC2/TCC2P cards to their configuration at the
start of the procedure.
Step 12
Verify that the TCC2/TCC2P cards appear as noted in
Step 13
Return to your originating procedure (NTP).
DLP-D255 Cross-Connect Card Side Switch Test
Caution
Always wait 60 seconds between cross-connect card (side) switches.
Step 1
From the View menu, choose
Go to Network View
.
Step 2
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-D227 Disable Alarm Filtering” task on
as necessary.
b.
Verify that no unexplained alarms appear on the network. If unexplained alarms appear, resolve
them before continuing. Refer to the
Cisco ONS 15454 SDH Troubleshooting Guide
if necessary.
Step 3
Click the
Conditions
tab. Verify that no unexplained conditions appear on the network. If unexplained
conditions appear, resolve them before continuing. Refer to the
Cisco ONS 15454 SDH Troubleshooting
Guide
if necessary.
Step 4
On the network map, double-click the node containing the cross-connect cards that you are testing to
open it in node view.
Step 5
Click the
Maintenance > Cross-Connect
tabs.
Step 6
In the Cross-Connect Cards area, make a note of the active and standby slots.
Purpose
This task verifies that the XC-VXL-10G, and XC-VXL-2.5G, or
XC-VXC-10G cards can effectively switch service (active to standby and
standby to active).
Tools/Equipment
The test set specified by the acceptance test procedure, connected and
configured as specified in the acceptance test procedure.
Prerequisite Procedures
DLP-D60 Log into CTC, page 17-49
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
Provisioning or higher
Summary of Contents for ONS 15454 SDH
Page 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Page 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...