17-9
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 17 DLPs D1 to D99
DLP- D8 Open the Front Cabinet Compartment (Door)
Figure 17-3
Mounting the Air Ramp in a Rack
Step 3
Repeat this task for every ONS 15454 SDH you need to install.
Step 4
Return to your originating procedure (NTP).
DLP-D8 Open the Front Cabinet Compartment (Door)
Note
The ONS 15454 SDH has an ESD plug input and is shipped with an ESD wrist strap. The ESD plug input
is located on the outside of the shelf assembly on the right side. It is labeled “ESD” on the top and
bottom. Always wear an ESD wrist strap and connect the strap to the ESD plug when working on the
ONS 15454 SDH.
Step 1
Open the front door lock.
The ONS 15454 SDH comes with a pinned hex key for locking and unlocking the front door. Turn the
key counterclockwise to unlock the door and clockwise to lock it.
Purpose
This task opens the front door.
Tools/Equipment
Pinned hex (Allen) key
Prerequisite Procedures
NTP-D2 Install the Shelf Assembly, page 1-5
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
61582
Equipment rack
Summary of Contents for ONS 15454 SDH
Page 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Page 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...