DLP- D7 Mount Multiple Shelf Assemblies in a Rack
Figure 17-2
Three-Shelf ONS 15454 SDH Bay Assembly
Step 2
Mount the air ramp above the ONS 15454 SDH. The air ramp is needed if you install more than one shelf
in the ETSI rack. Install the air ramp below the top shelf assembly. To ensure that the air ramp is secure,
use one or two M6 mounting screws for each side of the shelf assembly (
61583
Fuse and Alarm Panel,
mountable in the rack
if the rack is 2200 mm
(86.6 in.) high or higher
Air Ramp
ETSIs (SDH)
Air Ramp
Summary of Contents for ONS 15454 SDH
Page 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Page 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...