4-11
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
OL-27038-01
Chapter 4 Installing And Performing Initial Leveling of the Main Display Structure
Installing and Leveling the Display Structure
Step 6
Attach the tie bars to the left and right display structure by completing the following steps:
a.
Place the left and right structures in their approximate position.
b.
Lift the center structure (with the bottom tie bars attached) over each side structure using the dowel
pins on the left and right tie bars to aid in aligning the structures.
c.
Screw the top plate down using M8x16mm screws.
Note
Do not fully tighten the screws until you perform final leveling of the entire display structure.
Figure 4-9
Attaching the Left and Right Display Structures to the Lower Tie Bar (1 of 2)
Key
Part Description
Part/Kit Number
Qty
Ctn
Notes
1
M8 x 16mm pan head screws
48-3012-01
Kit #69-2365-xx
4
6
2
M8 x 35mm pan head screws
48-3008-01
Kit #69-2366-xx
8
6