4-10
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
OL-27038-01
Chapter 4 Installing And Performing Initial Leveling of the Main Display Structure
Installing and Leveling the Display Structure
Step 5
From the rear of the structure, connect the tie bars to the center structure by inserting M8 x 35mm screws
through the tie bars and loosely securing them.
Note
Do not fully tighten the screws until you perform final leveling of the entire display structure.
Note
Note that the longer screws attach horizontally through the tie bars.
Figure 4-8
Connecting the Tie-Bars to the Structure
Key
Part Description
Part/Kit Number
Qty
Ctn
Notes
1
M8 x 35mm pan head screws
48-3008-01
Kit #69-2366-xx
8
6