C H A P T E R
4-1
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
OL-27038-01
4
Installing And Performing Initial Leveling of the
Main Display Structure
Revised: May 20, 2015, OL-27038-01
This chapter describes the steps you perform to install the display structure and includes the following
sections:
•
Installing and Leveling the Display Structure, page 4-2
•
Installing Seismic Brackets (Optional), Part Number CTS-TX9K-SEISMIC=, page 4-15
Caution
The display structures are unstable during assembly. Use caution, and support all structures as required.
Caution
Some system components have metal edges with hard angles. These edges are exposed until you
complete system assembly. Use caution when you move around the system during assembly to avoid
contact with any exposed system edges.
Warning
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Note
The directions
left
and
right
refer to the assembly as you face the displays.