9-5
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
OL-27038-01
Chapter 9 Starting Installation of the First Row Table
Starting Installation of the First Row Table
Step 3
Level the legs and center structure by adjusting the feet on the bottom of the table legs.
Tip
Diamond-shaped holes are provided on the upper sides of the legs; use a laser level and level the structure
by using the center of the diamonds as a reference point.
Step 4
Attach the center structure to the cable runner base using two M6 x 16mm screws.
Figure 9-3
Leveling the Structure and Attaching the Cable Runner Base
Key
Part Description
Part Number
Qty
Ctn
Notes
1
M6 x 16mm pan head screw
48-3000-01
Kit #69-2356-xx
2
6