
To Install:
1. If replacing the instrument panel (I/P), install the air distribution duct vents into the
instrument panel (I/P).
2. If replacing the instrument panel (I/P), install the inflatable restraint instrument
panel (I/P) module into the instrument panel (I/P).
3. Place the instrument panel (I/P) into the vehicle.
NOTE:
Make sure that there are no wiring harnesses or connectors pinched behind
the instrument panel (I/P).
4. Seat the instrument panel (I/P) onto the positioning locators.
5. Install the middle and upper bolts into the instrument panel (I/P).
6. Install the lower retaining bolts into the instrument panel (I/P).
7. After all bolts have been installed, torque the bolts to
62 in-lb (7 Nm)
.
8. Install the screw into the side window defogger outlet.
9. Install the right access cover onto the instrument panel (I/P).
10. Install the upper front speaker into the instrument panel (I/P).
11. Install the upper trim pad onto the instrument panel (I/P).
12. Install the garnish molding onto the left and right A-pillars.
13. If replacing the instrument panel (I/P), install the headlamp bezel into the
instrument panel (I/P).
14. Install the headlamp switch into the instrument panel (I/P).
15. Install the left access cover onto the instrument panel (I/P).
16. Install the HVAC module harness into the instrument panel (I/P) substrate.
17. Install the front HVAC module into the instrument panel (I/P).
18. Install the radio into the instrument panel (I/P).
19. Install the instrument cluster into the instrument panel (I/P).
20. For Chevrolet vehicles, install the instrument cluster bezel into the instrument panel
(I/P).
21. For GMC and Oldsmobile vehicles, install the accessory trim plate onto the
instrument panel (I/P).
22. For GMC and Chevrolet vehicles, install the lower sound insulator panel onto the
instrument panel (I/P).
23. Install the center console into the vehicle.
24. For Oldsmobile vehicles, install the shift lever bezel from the center console.
25. Install the storage compartment door onto the instrument panel (I/P).
26. Install the right insulator panel onto the instrument panel (I/P).
27. Install the steering column into the vehicle.
28. Attach the left HVAC floor duct to the instrument panel (I/P).
29. Install the knee bolster onto the instrument panel (I/P).
30. Install the left insulator panel onto the instrument panel (I/P).
31. Connect the negative battery cable to enable the SIR system.
Summary of Contents for TrailBlazer
Page 1: ......
Page 26: ...Fig 3 Typical body and undervehicle maintenance locations Refer to chart for descriptions ...
Page 29: ......
Page 30: ......
Page 31: ......
Page 175: ...Spring free length check Valve spring squareness check ...
Page 192: ...Front of piston mark ...
Page 361: ...5 3L Engine Except Saab Underhood Fuse Block 2003 2005 Early Production ...
Page 469: ...Removing the outer band from the CV boot Removing the inner band from the CV boot ...
Page 470: ...Removing the CV boot from the joint housing Clean the CV joint housing prior to removing boot ...
Page 471: ...Removing the CV joint housing assembly Removing the CV joint ...
Page 472: ...Inspecting the CV joint housing Removing the CV joint outer snap ring ...
Page 473: ...Checking the CV joint snap ring for wear CV joint snap ring typical ...
Page 474: ...Removing the CV joint assembly Removing the CV joint inner snap ring ...
Page 475: ...Installing the CV joint assembly typical ...
Page 553: ...9 Torque the lug nuts to specification 10 Lower the vehicle ...
Page 556: ...Toe in Frame Misalignment Frame misalignment ...
Page 588: ...Bleeding caliper ...
Page 624: ...Manifold gauge set components Refrigerant recovery recycling station ...
Page 676: ...A C Specifications ...
Page 677: ......