Chapter 2
2-4
11) Open the toner replacement outer cover [1] to remove the screw [2].
F-2-13
12) Detach the main station upper front cover [1] while lifting its left side up.
- 5 claws [2]
F-2-14
13) Detach the toner supply front cover [1].
- 2 screws [2]
F-2-15
14) Detach the toner supply right cover [1].
- 2 rubber covers [2]
- 2 screws [3]
F-2-16
15) Move the toner supply assembly [1] in the direction of the arrow.
- 6 connectors [2]
- 3 screws [3]
F-2-17
16) Detach the main station upper middle cover 2 [1].
- 5 screws [2]
F-2-18
[1]
[2]
[1]
[2]
[1]
[2]
[3]
[2]
[3]
[1]
[2]
[2]
Summary of Contents for iPR C7010VP Series
Page 2: ......
Page 9: ......
Page 13: ......
Page 14: ...Chapter 1 Replacement Parts ...
Page 15: ......
Page 17: ......
Page 41: ......
Page 42: ...Chapter 2 Parts Replacement Procedure ...
Page 43: ......
Page 154: ...Chapter 2 2 109 ...
Page 155: ......
Page 156: ...Apr 5 2011 ...
Page 157: ......