Chapter 2
2-103
F-2-423
T-2-13
1) Remove the horizontal path unit.
Please r efer to "Removing H orizontal Pa th U nit" in "POD D eck A1
Service Manual."
2) Remove the rail [1] on the right.
- 1 screw [2]
F-2-424
3) Remove the 4 motor mounts [1] and the 4 timing belts [2].
- 1 wire saddle [3]
- 1 connector each [4]
- 2 screws each [5]
F-2-425
4) Remove the 4 bearings [1] on the rear side.
- 1 E ring each [2]
- 1 pulley each [3]
- 1 dowel pin each [4]
F-2-426
No.
Name of part
Qty.
[1] Horizontal path roller 1
1
[2] Horizontal path roller 2
1
[3] Horizontal path roller 3
1
[4] Horizontal path roller 4
1
[2]
[1]
[3]
[4]
[2]
[1]
CAUTION: Point to note when attaching
Attach the timing belts [1] to cover the motor pulleys [2], the pulleys [3] and
the tensioner rollers [4] uniformly.
[1]
[1]
[2]
[2]
[1]
[1]
[2]
[2]
[3]
[4]
[4]
[4]
[5]
[5]
[5]
[5] [4]
[5]
[2]
[1]
[3]
[4]
[2]
[1]
[3]
[2]
[1]
[3]
[4]
[4]
[2]
[1]
[3]
[4]
[1]
[2]
[3]
[4]
Summary of Contents for iPR C7010VP Series
Page 2: ......
Page 9: ......
Page 13: ......
Page 14: ...Chapter 1 Replacement Parts ...
Page 15: ......
Page 17: ......
Page 41: ......
Page 42: ...Chapter 2 Parts Replacement Procedure ...
Page 43: ......
Page 154: ...Chapter 2 2 109 ...
Page 155: ......
Page 156: ...Apr 5 2011 ...
Page 157: ......