2. Installation procedures
-
43
-
7.5 Image quality checks
(1) Objective
To check the final quality of the images.
(2) Tools used
Radiographic phantom
<Procedure>
Step/item Description/conditions
1.
Distance between X-ray bulb focal point and detector
Xcm: Based on grid used
2.
Proceed with calibration.
• The calibration must be completed successfully.
3.
Proceed with Self-diagnosis and Performance test.
• All the items must pass the self-diagnosis.
X-ray tube
focal point
Xcm
Center line at
right angle
CXDI detector
Self-diagnosis
<Positioning>
Align the positions between the
X-ray tube and detector.
Calibration
Summary of Contents for CXDI-80C
Page 6: ...Note These measurements are only guidelines ...
Page 10: ...1 1 O Ov ve er rv vi ie ew w 2 2 System diagram ...
Page 48: ...2 Installation procedures 15 4 Handle unit option Corner pads Outer box Inner box ...
Page 133: ...Rev 01 CONTENTS Detector unit 1 X ray interface box unit 2 Wiring unit 4 Handle unit 6 ...