FlowStar2 LB 514
12. FlowStar² Controller Software
97
Validation
The “Validation” tab shows the dates of the validation process
as well as upcoming test dates. In the subcategories Test H-3;
Test C-14; Test BG; Test BGO the test results of the validation
measurements as well as the first validation can be reviewed as
a table or graph.
For further information regarding the validation refer to chapter
6.
The graphs and reports can be created by clicking on the
“Create
Report” link below the data window. The validation report will look
like this: