FlowStar2 LB 514
Contents
3
1. Introduction
1.1 Contents
Assembly and Disassembly of Measuring Cells ........................................... 33
Cleaning the Measuring Chamber ................................................................ 37
VALIDATION USING 3H- UND 14C-TEST SOURCES ............................... 49
Checking the FlowStar² with test sources ..................................................... 50
STARTUP OF THE HPLC SYSTEM ............................................................ 54
Installation of the Capillaries at the Measuring Cell ...................................... 59