HANDLE BAR
4
81
CHAS
HANDLE BAR INSTALLATION
Park the bike levelled.
3
Install:
• the brake trestle
WARNING
Support the bike using suitable supports so that it
cannot fall.
NOTE:
• Install the trestle of the brake pump with the
mark “UP” facing upwards.
• Firstly, fasten the upper screw, then the lower
screw.
NOTE:
Align the protrusion of the switch with the hole
on the right side handle bar.
Install:
• the right side handle bar switch
2
1
A
D
3
B
C
Install:
• the accelerator knob
• the slot of the accelerator cable
• the accelerator cables
4
F
4
NOTE:
• Align the coupling surfaces of the retainer
element of the brake pump trestle with THE
punching on the right side handle bar.
• There must be a 2 mm (0.07 in) space between the
switch on the right side handle bar and the brake
pump trestle.
E
F
2
A
B
C
D E
Recommended lubricant
TUTELA MR2 GREASE
LS
Fasten:
8 N m - 0.81 Kgf•m
T.
R.
Summary of Contents for 2009 TREK1130
Page 2: ...Workshop Manual 2009 ...
Page 3: ......
Page 9: ......
Page 10: ...GEN INFO 1 ...
Page 12: ...GEN INFO ...
Page 26: ...SPEC 2 ...
Page 28: ...SPEC ...
Page 54: ...CHK ADJ 3 ...
Page 57: ...CHK ADJ ...
Page 157: ...CHAS 4 ...
Page 162: ...CHAS ...
Page 269: ...4 107 ENGINE CHAS ENGINE REMOVAL 1 2 3 4 5 6 8 10 11 9 7 12 ...
Page 321: ...ENG 5 ...
Page 326: ...ENG ...
Page 360: ...HEAD DISTRIBUTION ENG HEAD REMOVAL 5 34 8 9 9 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 3 7 3 5 4 6 ...
Page 377: ...CYLINDERS ENG CYLINDERS REMOVAL 5 51 1 1 2 3 4 4 ...
Page 397: ...ENG CLUTCH REMOVAL 5 71 5 8 9 10 11 12 13 13 14 1 2 3 7 CLUTCH 6 4 15 PM S ...
Page 483: ...COOL 6 ...
Page 485: ...COOL ...
Page 509: ...ELEC 7 ...
Page 512: ...ELEC ...
Page 573: ...ELECTRIC LAYOUT ELECTRIC PLANT 7 61 ELEC ...
Page 579: ......
Page 581: ......
Page 582: ......