HEAD DISTRIBUTION
ENG
5
26
RRotate:
• the drain and inlet cam shaft
in phase anti-clockwise using a 24 spanner, bringing
the olives in cylinder 1, facing each other.
3
3
4
24
24
4
F
Install:
• the Z34 gear
(see paragraph “5.13”).
Partially rotate the cam anti-clockwise using a 24
spanner in order to hook and tension the
distribution chain, positioning the reference as
shown in figure .
a
•• the Z34 gear
(see paragraph “5.14”).
on the inlet shaft hooking the chain on to the already
positioned gear as shown in figure ; therefore
rotate the inlet cam reaching the stop point and
relative insertion in the seat.
G
b
PM
S
24
NEW
NEW
a
F
b
G
N
NOTE:
Engine phasing tolerance: 3°.
Summary of Contents for 2009 TREK1130
Page 2: ...Workshop Manual 2009 ...
Page 3: ......
Page 9: ......
Page 10: ...GEN INFO 1 ...
Page 12: ...GEN INFO ...
Page 26: ...SPEC 2 ...
Page 28: ...SPEC ...
Page 54: ...CHK ADJ 3 ...
Page 57: ...CHK ADJ ...
Page 157: ...CHAS 4 ...
Page 162: ...CHAS ...
Page 269: ...4 107 ENGINE CHAS ENGINE REMOVAL 1 2 3 4 5 6 8 10 11 9 7 12 ...
Page 321: ...ENG 5 ...
Page 326: ...ENG ...
Page 360: ...HEAD DISTRIBUTION ENG HEAD REMOVAL 5 34 8 9 9 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 3 7 3 5 4 6 ...
Page 377: ...CYLINDERS ENG CYLINDERS REMOVAL 5 51 1 1 2 3 4 4 ...
Page 397: ...ENG CLUTCH REMOVAL 5 71 5 8 9 10 11 12 13 13 14 1 2 3 7 CLUTCH 6 4 15 PM S ...
Page 483: ...COOL 6 ...
Page 485: ...COOL ...
Page 509: ...ELEC 7 ...
Page 512: ...ELEC ...
Page 573: ...ELECTRIC LAYOUT ELECTRIC PLANT 7 61 ELEC ...
Page 579: ......
Page 581: ......
Page 582: ......