Adjust:
• the thread of regulator and of regulator
up to the specified measurement.
ENGINE/WIRED ACTUATOR
C
If the control of the wired actuator is not sufficient for
the correct throttle closing cycle, check the cables
clearance adjustment.
Loosen:
• the nuts of the drain valve regulator
(on 3 in 1 exhaust pipe)
CONTROL 2
7
6
8
Adjust:
•
ensuring it is always tensioned but keeping the
stand-by position of the drain valve.
• the tensioning of the cable
3
15
CHK
ADJ
D
8
F
Measurements of the regulator threads
9.8 mm (0.38 in)
9.4 mm (0.37 in)
D
6
E
F
F
E
9
10
Install:
• the filter box lid
See paragraph "3.13".
• the tank
See "FRAME 4.119" paragraph.
• the seat
See "FRAME 4.131" paragraph.
Install:
•• the 2 screws
9
G
G
E
Summary of Contents for 2009 TREK1130
Page 2: ...Workshop Manual 2009 ...
Page 3: ......
Page 9: ......
Page 10: ...GEN INFO 1 ...
Page 12: ...GEN INFO ...
Page 26: ...SPEC 2 ...
Page 28: ...SPEC ...
Page 54: ...CHK ADJ 3 ...
Page 57: ...CHK ADJ ...
Page 157: ...CHAS 4 ...
Page 162: ...CHAS ...
Page 269: ...4 107 ENGINE CHAS ENGINE REMOVAL 1 2 3 4 5 6 8 10 11 9 7 12 ...
Page 321: ...ENG 5 ...
Page 326: ...ENG ...
Page 360: ...HEAD DISTRIBUTION ENG HEAD REMOVAL 5 34 8 9 9 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 3 7 3 5 4 6 ...
Page 377: ...CYLINDERS ENG CYLINDERS REMOVAL 5 51 1 1 2 3 4 4 ...
Page 397: ...ENG CLUTCH REMOVAL 5 71 5 8 9 10 11 12 13 13 14 1 2 3 7 CLUTCH 6 4 15 PM S ...
Page 483: ...COOL 6 ...
Page 485: ...COOL ...
Page 509: ...ELEC 7 ...
Page 512: ...ELEC ...
Page 573: ...ELECTRIC LAYOUT ELECTRIC PLANT 7 61 ELEC ...
Page 579: ......
Page 581: ......
Page 582: ......