The rear shock absorber is equipped with external
regulators to adjust the motorbike asset at the load
conditions.
The regulator , placed below, in correspondence
of the lower fixing of the shock absorber to the swing
arm, adjusts the hydraulic brake during the
extending phase (return).
The regulator adjusts the spring pre-load.
FRAME/REAR SHOCK ABSORBER SET ADJUSTMENT
3
69
REAR SHOCK ABSORBER SET
ADJUSTMENT
N
S
NOTE:
Support the bike using suitable supports so that it
cannot fall.
CHK
ADJ
1
Adjust:
• the spring pre-load
A
B
B
A
SPRING PRE-LOAD
Rotate the adjusting screw in or
direction
a
C
D
1
C
D
E
D
E
D
E
DIRECTION
DIRECTION
the spring pre-load increases
the spring pre-load decreases
ADJUSTING POSITIONS
Minimum:
0
Standard:
-17
Maximum:
-30
Summary of Contents for 2009 TREK1130
Page 2: ...Workshop Manual 2009 ...
Page 3: ......
Page 9: ......
Page 10: ...GEN INFO 1 ...
Page 12: ...GEN INFO ...
Page 26: ...SPEC 2 ...
Page 28: ...SPEC ...
Page 54: ...CHK ADJ 3 ...
Page 57: ...CHK ADJ ...
Page 157: ...CHAS 4 ...
Page 162: ...CHAS ...
Page 269: ...4 107 ENGINE CHAS ENGINE REMOVAL 1 2 3 4 5 6 8 10 11 9 7 12 ...
Page 321: ...ENG 5 ...
Page 326: ...ENG ...
Page 360: ...HEAD DISTRIBUTION ENG HEAD REMOVAL 5 34 8 9 9 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 3 7 3 5 4 6 ...
Page 377: ...CYLINDERS ENG CYLINDERS REMOVAL 5 51 1 1 2 3 4 4 ...
Page 397: ...ENG CLUTCH REMOVAL 5 71 5 8 9 10 11 12 13 13 14 1 2 3 7 CLUTCH 6 4 15 PM S ...
Page 483: ...COOL 6 ...
Page 485: ...COOL ...
Page 509: ...ELEC 7 ...
Page 512: ...ELEC ...
Page 573: ...ELECTRIC LAYOUT ELECTRIC PLANT 7 61 ELEC ...
Page 579: ......
Page 581: ......
Page 582: ......