Test menu 4: Generator
Generator
Generator start relay is switched. The generator starts. However, there is no
changeover to the redundant line. The test is not terminated and the gener-
ator turned off again until the "RESET" button has been pressed. The
progress of the test is shown on the display.
Cancel
Back to test menu
The messages from this test are also stored in the history memory. The date of the test is saved to re-
member the next test once the test interval has elapsed.
Executing this function makes sense only when a generator is connected to the
redundant line and the associated settings have been carried out (see "Settings
menu 1: Changeover" on page 67). To avoid voltage interruptions, in the test
menu "Generator", the ATICS® does not switch to the redundant line.
In order to test the generator and the changeover switch, select "Autom. change-
over" or "Manual changeover".
Risk that the generator test is accidentally not terminated
If the test menu 5: "Generator" is left after the generator has started, then ATICS®
remains in this switch position and in "TEST" mode. This means that the genera-
tor is not switched off.
- Wait until "Quit: RESET" appears on the display.
- Press the "RESET" button.
- Check whether the generator is switched off.
Generator
Cancel
Generator
TEST
t(1->2):
8s
t(Test):
--
Quit: RESET
WARNING
Summary of Contents for ATICS-2-63A-DIO
Page 22: ...System description 22 ATICS DIO_D00080_01_M_XXEN 04 2015...
Page 44: ...Commissioning settings and testing 44 ATICS DIO_D00080_01_M_XXEN 04 2015...
Page 58: ...Operation 58 ATICS DIO_D00080_01_M_XXEN 04 2015...
Page 86: ...Troubleshooting 86 ATICS DIO_D00080_01_M_XXEN 04 2015...
Page 95: ...95 ATICS DIO_D00080_01_M_XXEN 04 2015 10 Data 10 1 T V test report...