7. Discuss and record the details of furniture, cupboards, and machinery in the interior
of buildings on every floor.
8. Ask about other building details as necessary and record this information.
Identify existing cabling
Gather the following information and enter it into the work order.
Identifying existing cabling
1. Obtain the location of the telephone switching room.
2. Determine the total length of the existing cable.
3. Ask about the existing cabling from the DAPs to the IP Switch.
The wiring from the DAPs to the IP Switch must be at least UTP Cat 5.
Assess radio coverage
If the customer requires the basestations be installed out of sight, this can reduce the coverage
capability of each basestation. Obstacles can limit the performance of the system and increase
costs.
Gather the following information and enter it into the work order.
Assessing radio coverage
1. Record areas where radio coverage is required.
2. Record areas where radio coverage is not required.
3. Record external or outdoor radio coverage.
4. Record where radio coverage is not feasible or requires specific basestations.
5. Record areas excluded from radio coverage due to the proximity of sensitive
electronic equipment.
6. Record objects inside buildings that can affect radio coverage.
7. Record unsuitable basestation locations, such as stone columns, air ducts or
horizontally on the ceiling.
8. Discuss which basestations are to be installed out of sight.
9. Inquire about areas of special coverage, such as, elevators, stairwells, and
washrooms.
Site survey example
202 SIP DECT Fundamentals
October 2012
Summary of Contents for CS 1000
Page 6: ...6 SIP DECT Fundamentals October 2012 ...
Page 146: ...System administration 146 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Page 174: ...System maintenance 174 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Page 204: ...Site survey example 204 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...