Figure 30: Example of cell center boundary 1C6
Deploying on multiple floors
Use the information in this section to deploy SIP DECT in the following situations.
• The coverage area is on more than one floor.
• The floors are not adjacent.
Checking for through-the-floor coverage
The first step in covering a multi-floor building is to assess the availability of through-the-floor
coverage. In buildings mainly constructed of wood, you can use through-the-floor coverage.
However, due to the construction of most modern buildings with raised floors, high metal
content, and reinforced concrete, through-the-floor coverage with DECT is limited.
Checking for through-the-floor coverage
1. Place the deployment tool in a middle floor of the site.
2. Go to the floor above the deployment tool and enter the site survey mode on the
handset.
For more information, see
on page 43 if you use
on page 213 if you use an older
Deployment tool.
Site planning and hardware deployment
58 SIP DECT Fundamentals
October 2012
Summary of Contents for CS 1000
Page 6: ...6 SIP DECT Fundamentals October 2012 ...
Page 146: ...System administration 146 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Page 174: ...System maintenance 174 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...
Page 204: ...Site survey example 204 SIP DECT Fundamentals October 2012 Comments infodev avaya com ...