Installation
25
AT&T SB67010 Gateway, SB67030 Deskset System Administrator’s Guide
To install the Gateway: (Continued)
Figure 24. Synchronizing
The Gateway power-up initialization sequence follows:
a. About 20 seconds after turning on power to the Gateway, the POWER LED turns on and
the Initializing message displays on the screen a few seconds later.
b. When the Gateway connects to the network, the message screen displays the
Synchronizing screen to indicate that the Gateway is in the process of detecting and
synchronizing with other system devices, shown in Figure 24.
c. Once the Gateway has successfully finished synchronizing with the rest of the system,
the Idle screen updates the time, date and IP Address, as shown in Figure 24.
4. Remove the plastic covers from the PSTN (telephone) ports to be used, marked
LINE
1
through
LINE 4
and
BYPASS
.
5. Plug up to four telephone lines from the wall jacks into the Gateway. The line LEDs
blink up to 15 seconds during initialization.
NOTE:
The time and date may not be correct. The time and date are set using
the WEBUI. See
“Basic Settings” on page 63
.
Figure 25. DSL Connection
CAUTION:
If you subscribe to Digital Subscriber Line (DSL) high-speed
Internet service through your telephone line, you must plug
each telephone line with DSL service into a DSL filter. Then
plug the DSL filter into the telephone wall jack, as identified
in Figure 25.
NOTE:
For communication during power outages, plug an analog telephone into the
BYPASS
jack and a PSTN
line into
LINE 4
.