209
lower right screen will change to the text indicated in the table above (
Cal. Active
).
Read the measurement from your standard and enter it using the numeric keypad.
You may now store the new calibration number by pressing the ENTER key or escape
by pressing the EXIT key or the RESET button.
Calibration of DC Continuity
The load/meter screen and prompt screens will contain the following text for this
calibration point:
Upper Right Screen
Load/Meter
Lower Right Screen
Prompt
Lower Right Screen
Prompt (Cal. Active)
Step 1: Short the Current
and Return leads
together.
When the leads are
shorted, press TEST to
start the calibration
process.
Automatic Calibration
Processing.
Step 2: Connect the
standard 10
load from
Current to Return.
When the load is
connected, press TEST to
start the calibration
process.
Automatic Calibration
Processing.
Step 3: Connect the
standard 100
load from
Current to Return.
When the load is
connected, press TEST to
start the calibration
process.
Automatic Calibration
Processing.
Step 4: Connect the
standard 1000
load from
Current to Return.
When the load is
connected, press TEST to
start the calibration
process.
Automatic Calibration
Processing.
Step 5: Connect the
standard 10000
load
from Current to Return.
When the load is
connected, press TEST to
start the calibration
process.
Automatic Calibration
Processing.
Press the TEST button to activate the calibration. After the calibration is activated, the
lower right screen will change to the text indicated in the table above (
Cal. Active
).
This calibration is automatic and does not require data entry.
Summary of Contents for OMNIA II 8204
Page 8: ...2 This Page Intentionally Left Blank ...
Page 87: ...81 conditions The different combinations are represented in the table below ...
Page 91: ...85 ...
Page 92: ...86 ...
Page 139: ...133 7 128 Power On PROMPT ESR ESE STB SPOLL SRE ESE SRE ...
Page 142: ...136 ...
Page 156: ...150 appear on the display ...
Page 169: ...163 Print Report Example ...
Page 181: ...175 ...