5-8 | IPS-4-UV Analyzer-GPDiv2
Changing Out Replaceable Parts
This section discusses the parts that should be changed out and/or
cleaned, according to the “Analyzer Preventive Maintenance Schedule.”
These descriptions focus on the AMETEK sample system. When replacing
parts in the analyzer refer to Figure 5-1 for the location of the main assem-
bly. Drawings of the assembly are also included under each section.
Preventing leaks in the sample system is critical to ensure proper
analyzer operation. If sample fluid migrates into the Optical Bench
Assembly or Reflector Block due to a leak in the Measuring Cell
Assembly, the optics will become damaged and most likely require
replacement. Most leaks are preventable with regular cleaning and
replacement of the Measuring Cell o-rings.
If the User Interface Panel
displays alarm messages that indicate a
faulty component requires replacement [as described under “Alarm
Conditions and Corrective Action” later in this chapter], review this
manual for replacement procedures.
For complex maintenance procedures not discussed in this manual,
such as replacing heaters, RTDs, or electronics boards, consult with
your AMETEK distributor or representative. Or, contact the factory
for assistance and information about returning the assembly/analyzer
to the factory for repair.
!
CAUTION
!
CAUTION
Summary of Contents for IPS-4-UV
Page 15: ...Contents xv...
Page 16: ...xvi IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 24: ...1 8 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 66: ...3 36 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 144: ...6 6 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 180: ...A 2 IPS 4 UV Analyzer GPDiv2 Analyzer Light Path Schematic...
Page 183: ...Appendix Drawings A 5 Detector Interface Board 100 1937...
Page 184: ...A 6 IPS 4 UV Analyzer GPDiv2 Detector Board 100 1955...
Page 185: ...Appendix Drawings A 7 Display Interface Board 100 1978...
Page 186: ...A 8 IPS 4 UV Analyzer GPDiv2 Customer Connection Board 100 1971...
Page 187: ...Appendix Drawings A 9 Relay Board 100 1942...
Page 188: ...A 10 IPS 4 UV Analyzer GPDiv2 Analog Board 100 1922...
Page 189: ...Appendix Drawings A 11 MCU Board 100 1914...
Page 190: ...A 12 IPS 4 UV Analyzer GPDiv2 Xenon Lamp Board 100 2061...
Page 191: ...Appendix Drawings A 13 Electronics Enclosure Wiring Diagram Sheet 1 of 3 WX 102877...
Page 192: ...A 14 IPS 4 UV Analyzer GPDiv2 Electronics Enclosure Wiring Diagram Sheet 2 of 3 WX 102877...
Page 193: ...Appendix Drawings A 15 Electronics Enclosure Wiring Diagram Sheet 3 of 3 WX 102877...
Page 194: ...A 16 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 196: ...S 2 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...