5-16 | IPS-4-UV Analyzer-GPDiv2
g. Inspect the interior of the Cell Body for foreign material. If neces-
sary, use a cotton swab to clean the Cell Body.
If a more thorough cleaning is required, use only cleaning materi-
als that are suitable for use with the sample species and the Cell.
Clean the fittings using the same method as the Cell Body.
For example:
If suitable for the species, an acceptable material is Chem-Thane
– or a nonabrasive detergent and water solution. The Cell Body
can then be rinsed with reagent-grade acetone (if suitable), fol-
lowed by a rinse with pharmaceutical-grade distilled water.
h. Allow all components to dry thoroughly before reassembling. Dry,
oil-free instrument air can be used to remove any remaining mois-
ture from the passages in the Cell Body and fittings.
6. Replacing parts/reassembling the Measuring Cell:
a. Insert a new o-ring in the o-ring groove on the flat surface of the
Reflector Block.
With the Cell held vertically so that the Reflector Block end of the
Cell is up, install a new o-ring by using your thumbs to push it
into the o-ring groove until it is completely seated in the groove.
While holding the edge of the Window, carefully place it in the
Cell.
Orient the Reflector Block correctly, and place it on the Cell.
Ensure the Cell Window does not slide out of position when the
Reflector Block is placed against the Cell.
It is critical to reassemble the Reflector Block in the exact orientation
as it was assembled at the factory.
Secure the Reflector Block to the Cell using three M4 x 20 mm
screws. Tighten the screws evenly.
b. With the Cell held vertically so that the Reflector Block end is
down, install a new o-ring by using your thumbs to push it into
the o-ring groove until it is completely seated in the groove.
While holding the edge of the Window, carefully place it in the
Cell, on top of the o-ring. Install a second, new o-ring on top of the
Window.
If an Optical Bench/Cell Insulator is used, properly align it and
secure it to the Cell using the three M4 x 12 mm screws.
!
CAUTION
Summary of Contents for IPS-4-UV
Page 15: ...Contents xv...
Page 16: ...xvi IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 24: ...1 8 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 66: ...3 36 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 144: ...6 6 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 180: ...A 2 IPS 4 UV Analyzer GPDiv2 Analyzer Light Path Schematic...
Page 183: ...Appendix Drawings A 5 Detector Interface Board 100 1937...
Page 184: ...A 6 IPS 4 UV Analyzer GPDiv2 Detector Board 100 1955...
Page 185: ...Appendix Drawings A 7 Display Interface Board 100 1978...
Page 186: ...A 8 IPS 4 UV Analyzer GPDiv2 Customer Connection Board 100 1971...
Page 187: ...Appendix Drawings A 9 Relay Board 100 1942...
Page 188: ...A 10 IPS 4 UV Analyzer GPDiv2 Analog Board 100 1922...
Page 189: ...Appendix Drawings A 11 MCU Board 100 1914...
Page 190: ...A 12 IPS 4 UV Analyzer GPDiv2 Xenon Lamp Board 100 2061...
Page 191: ...Appendix Drawings A 13 Electronics Enclosure Wiring Diagram Sheet 1 of 3 WX 102877...
Page 192: ...A 14 IPS 4 UV Analyzer GPDiv2 Electronics Enclosure Wiring Diagram Sheet 2 of 3 WX 102877...
Page 193: ...Appendix Drawings A 15 Electronics Enclosure Wiring Diagram Sheet 3 of 3 WX 102877...
Page 194: ...A 16 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 196: ...S 2 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...