3-20 | IPS-4-UV Analyzer-GPDiv2
To power up the analyzer and verify it is operating properly:
1. With the Electronics Enclosure open:
Close the
Main AC Power
and
DC Power
fuses. Refer to the Fuse Leg-
end (at the back of the Electronics Enclosure) for the location of these
fuses. If a power-disconnect switch (breaker)
was not installed
, main AC
power will be applied to the analyzer.
Do not power up the temperature-control zone circuitry (
Bench
Heater
fuse and
Oven Heater
fuse, if Oven/Sample System En-
closure is heated) until after the sample system leak check has been
performed and verified, as described later in this procedure.
If a power-disconnect switch
was installed
, close it to apply main AC
power to the analyzer.
2. After applying AC main power to the analyzer, the message
“System
Starting”
is displayed momentarily on the top line of the User Inter-
face Panel. Following this, the
AMETEK Process Instruments
start-up
screen will appear. This screen also displays the software version.
After the start-up screen, the system defaults to the
HOME
screen
which allows you to view the current status of up to seven factory-
configured parameters. These parameters are displayed on the left
side of this screen. The right side of this screen displays the current
operational status of the analyzer. Descriptions of these parameters
and states are described under “HOME Menu Screen” and “System
Status Messages (HOME Screen),” in Chapter 4.
If these screens do not appear, check the AC wiring to ensure it is
properly connected.
To check the AC wiring, take all necessary safety precautions to power
down the analyzer and open the
Main AC Power
and
DC Power
fuses.
Wait 2 minutes to allow the high-voltage capacitors to discharge.
Review the Customer Connections drawing and check the wiring
terminations from the main AC power supply source to the analyzer.
Take all necessary safety precautions and reapply power to the ana-
lyzer by closing the
Main AC Power
and
DC Power
fuses. Check the
User Interface Panel again to see if these screens appear. If so, continue
with the next step.
!
WARNING
NOTE
NOTE
Summary of Contents for IPS-4-UV
Page 15: ...Contents xv...
Page 16: ...xvi IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 24: ...1 8 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 66: ...3 36 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 144: ...6 6 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 180: ...A 2 IPS 4 UV Analyzer GPDiv2 Analyzer Light Path Schematic...
Page 183: ...Appendix Drawings A 5 Detector Interface Board 100 1937...
Page 184: ...A 6 IPS 4 UV Analyzer GPDiv2 Detector Board 100 1955...
Page 185: ...Appendix Drawings A 7 Display Interface Board 100 1978...
Page 186: ...A 8 IPS 4 UV Analyzer GPDiv2 Customer Connection Board 100 1971...
Page 187: ...Appendix Drawings A 9 Relay Board 100 1942...
Page 188: ...A 10 IPS 4 UV Analyzer GPDiv2 Analog Board 100 1922...
Page 189: ...Appendix Drawings A 11 MCU Board 100 1914...
Page 190: ...A 12 IPS 4 UV Analyzer GPDiv2 Xenon Lamp Board 100 2061...
Page 191: ...Appendix Drawings A 13 Electronics Enclosure Wiring Diagram Sheet 1 of 3 WX 102877...
Page 192: ...A 14 IPS 4 UV Analyzer GPDiv2 Electronics Enclosure Wiring Diagram Sheet 2 of 3 WX 102877...
Page 193: ...Appendix Drawings A 15 Electronics Enclosure Wiring Diagram Sheet 3 of 3 WX 102877...
Page 194: ...A 16 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Page 196: ...S 2 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...