
Construction and function of the basic machine
UF02 BAG00225.3 09.22
79
5.11 Spülwassertank
(1) Flushing water tank
(2) Filling opening
(3) Filling level indicator
(4) Draining
The flushing water tank introduces clear fresh water to the mixture.
The water serves to
thin the residue in the spray liquid tank at the end of spraying
operation.
clean (flush) the whole field sprayer in the field.
clean the suction chest and the spray lines when the tank is full.
Screw lid with breather valve for the fill opening.
Füllen Sie nur klares Wasser in die Spülwassertank.
Summary of Contents for UF 1002
Page 20: ...General safety instructions 20 UF02 BAG00225 3 09 22 Super S boom...
Page 21: ...General safety instructions UF02 BAG00225 3 09 22 21 Q Plus boom...
Page 217: ...Liquid circuit UF02 BAG00225 3 09 22 217 Part width section control...
Page 218: ...Liquid circuit 218 UF02 BAG00225 3 09 22 Single nozzle control Flushing water pump...
Page 219: ...Liquid circuit UF02 BAG00225 3 09 22 219 Single nozzle control FlowControl...
Page 223: ...Spray table UF02 BAG00225 3 09 22 223...
Page 232: ......