
Coupling and uncoupling the machine
128
UF02 BAG00225.3 09.22
CAUTION
Risk of collision of the parking de-
vice with the tractor wheel.
Before starting off, check that there is
enough space between the tractor and
the implement in all mounting posi-
tions.
The parking wheel must always be
able to turn freely.
1. Set the tractor lower links to the same
height.
2. Fasten and secure the ball sleeves in the
coupling points of the 3-point hitch.
3. Drive the tractor towards the implement so
that enough space remains between the
tractor and implement to be able to couple
the supply lines.
4. Couple the supply lines.
5. Couple the universal joint shaft.
6. Drive the tractor towards the implement.
7. Couple the lower links from the tractor seat.
8. Couple the top link from the tractor seat.
9. Check that the top and lower link hooks are
correctly locked.
10. Raise the implement to transport position.
11. Adjust the length of the top link so that the
boom carrier is perpendicular to the
mounted sprayer.
12. Move the parking supports into transport
position.
Summary of Contents for UF 1002
Page 20: ...General safety instructions 20 UF02 BAG00225 3 09 22 Super S boom...
Page 21: ...General safety instructions UF02 BAG00225 3 09 22 21 Q Plus boom...
Page 217: ...Liquid circuit UF02 BAG00225 3 09 22 217 Part width section control...
Page 218: ...Liquid circuit 218 UF02 BAG00225 3 09 22 Single nozzle control Flushing water pump...
Page 219: ...Liquid circuit UF02 BAG00225 3 09 22 219 Single nozzle control FlowControl...
Page 223: ...Spray table UF02 BAG00225 3 09 22 223...
Page 232: ......