
Cleaning the implement after operation
UF02 BAG00225.3 09.22
177
12.7
External cleaning
UF with front tank: FlowControl must be
switched off, otherwise the concentration
in the front tank will be diluted.
1. Run the pump.
2. TwinTerminal: Select flushing water
.
3. If internal cleaning was not previously per-
formed:
Switch
tap
DA
in position
for 30
seconds until flushing water is available.
4. Pressure valve chest
DA
in position
.
5. Clean the field sprayer and the sprayer
boom with the spray gun.
6. Afterwards, put the control elements back
to their initial position.
Summary of Contents for UF 1002
Page 20: ...General safety instructions 20 UF02 BAG00225 3 09 22 Super S boom...
Page 21: ...General safety instructions UF02 BAG00225 3 09 22 21 Q Plus boom...
Page 217: ...Liquid circuit UF02 BAG00225 3 09 22 217 Part width section control...
Page 218: ...Liquid circuit 218 UF02 BAG00225 3 09 22 Single nozzle control Flushing water pump...
Page 219: ...Liquid circuit UF02 BAG00225 3 09 22 219 Single nozzle control FlowControl...
Page 223: ...Spray table UF02 BAG00225 3 09 22 223...
Page 232: ......