
Cleaning, maintenance and repairs
UF02 BAG00225.3 09.22
181
Regular and proper maintenance will keep your trailed sprayer in
good condition for a long time, and will prevent early signs of
wear. Regular and proper maintenance is a requirement of our
warranty conditions.
Use only genuine AMAZONE spare parts (see "Spare and wear
parts and aids" section, page 17).
Use only genuine AMAZONE replacement hoses, and hose
clamps made of V2A for assembly.
Specialist knowledge is the requirement for carrying out testing
and maintenance operations. This specialist knowledge is not
given here in this operating manual.
Observe environmental protection measures when carrying out
cleaning and maintenance work.
Observe legal requirements when disposing of lubricants, e.g.
oils and grease. Also affected by these legal requirements are
parts that come into contact with these lubricants.
Do not exceed a greasing pressure of 400 bar when greasing
with high pressure grease guns.
The following are prohibited:
drilling the running gear.
drilling through pre-existing holes on the transport frame.
welding load-bearing components.
Protective measures are necessary, such as covering lines or
extending lines in particularly critical locations
during welding, drilling and grinding work.
when working with cut-off wheels near plastic lines and
electric wires.
Clean the field sprayer thoroughly with water before carrying out
repair work.
Carry out repair work on the field sprayer with the pump
switched off.
Thorough cleaning must be carried out before repair work can
be carried out inside the spray liquid tank. Keep out of the spray
liquid tank.
Disconnect the machine cable and power supply from the on-
board computer
when carrying out any cleaning or maintenance
work. This applies especially to welding on the machine.
Summary of Contents for UF 1002
Page 20: ...General safety instructions 20 UF02 BAG00225 3 09 22 Super S boom...
Page 21: ...General safety instructions UF02 BAG00225 3 09 22 21 Q Plus boom...
Page 217: ...Liquid circuit UF02 BAG00225 3 09 22 217 Part width section control...
Page 218: ...Liquid circuit 218 UF02 BAG00225 3 09 22 Single nozzle control Flushing water pump...
Page 219: ...Liquid circuit UF02 BAG00225 3 09 22 219 Single nozzle control FlowControl...
Page 223: ...Spray table UF02 BAG00225 3 09 22 223...
Page 232: ......