
Construction and function of the basic machine
60
UF02 BAG00225.3 09.22
Suction valve chest display (SA)
Suction via suction hose
Suction from spray liquid tank
Suction from flushing water tank
TwinTerminal
The suction valve chest is electrically switched
via the TwinTerminal
Switch tap source for induction bowl (QU)
Use liquid from the suction valve
chest for the induction bowl
Use filling water from the pressure
connection for the induction bowl
Switch tap injector (IJ)
Suction from induction bowl
Increase filling capacity using injec-
tor
Pressure filter switch tap (DE)
Drain pressure filter
Suction from container switch tap (GA)
100% maximum suction capacity
Summary of Contents for UF 1002
Page 20: ...General safety instructions 20 UF02 BAG00225 3 09 22 Super S boom...
Page 21: ...General safety instructions UF02 BAG00225 3 09 22 21 Q Plus boom...
Page 217: ...Liquid circuit UF02 BAG00225 3 09 22 217 Part width section control...
Page 218: ...Liquid circuit 218 UF02 BAG00225 3 09 22 Single nozzle control Flushing water pump...
Page 219: ...Liquid circuit UF02 BAG00225 3 09 22 219 Single nozzle control FlowControl...
Page 223: ...Spray table UF02 BAG00225 3 09 22 223...
Page 232: ......