
4 . Setting the Laser Light Output Schedule
83
MF-C300A-SF/C500A-SF
Chapter 2 V
arious Settings
Introduction Part
Inst
allat
ion and
Preparation Part
Operating Part
Maintenance Part
Appendixes
SCHEDULE Screen (Flexible Waveform (FLEX))
How to see the displayed items
: Settable item
SET POWER
Sets the laser output. Regarding “POINT 01” to “POINT 20”, set the ratio (%)
supposing that the set value is the reference value (100%). Refer to “REFER-
ENCE VALUE” for the forecast value of laser output.
<Note>
The settable value of laser output differs depending on the model.
MF-C300A-SF: 30 to 300 / MF-C500A-SF: 50 to 500
MIN
The ratio of the preliminary oscillation output for "SET POWER" is displayed.
For the preliminary oscillation, see page 82.
Scrolls the POINT display column of POINT 01 to POINT 20 to the right and left.
When a POINT is not displayed, press this button to display it.
POINT 01 to 20
Sets the laser output time and laser output value at each point of "POINT 01" to
"POINT 20."
REFERENCE
VALUE
The forecast value of
laser output energy (J) based on the set laser output
schedules is displayed.
<Note>
There is a little difference between the forecast value of laser output energy and
the measured value (actually measured value) depending on the optical and
electrical characteristics. Use the forecast value of laser output energy as refer-
ence.
RESOL
When this button is pressed, the selected setting resolution can be set from 0.01
ms or 0.05 ms.
When the setting resolution is changed, the currently-selected schedule is
cleared and the initial value is set.
MODU
When this button is pressed, the modulation setting screen for the selected
schedule number opens. Blinks when the modulation function is enabled. The
function can be set on the MODULATION screen.
SEAM
When this button is pressed, the seam setting screen for the selected schedule
number opens. Blinks when the fade function for seam processing is enabled.
The function can be set on the SEAM screen.
Summary of Contents for MF-C300A-SF
Page 20: ......
Page 21: ...Introduction Part...
Page 22: ......
Page 36: ......
Page 37: ...Installation and Preparation Part...
Page 38: ......
Page 42: ......
Page 50: ......
Page 51: ...Operating Part...
Page 52: ......
Page 114: ......
Page 159: ...Maintenance Part...
Page 160: ......
Page 176: ......
Page 177: ...Appendixes...
Page 178: ......