The
Task List
table lists all the tasks that have been configured. The meanings
of the headings are explained in the table, below:
Adding a Task
To add a task, do the following:
1. Click the arrow at the right of the
Add
field to drop down the list of task
choices:
2. Click on the task you want to add.
Depending on the task you choose, a page comes up with various choices for
you to make. While each of the tasks is different, for the most part the
procedures involved in setting them up are similar. The following examples
take you through the various task procedures you will encounter.
Heading
Explanation
Name
The name you gave to the task when you configured it.
Type
The type of task that it is.
Next Run
If the task is scheduled to be run at a certain time, the time that
it will run appears here.
Last Run
Indicates the last time that the task ran.
Status
Indicates whether the task is running or is idle.