322
Maintaining Your GC
16
Maintaining the G3435A/G3436A FPD
To Install the FPD Vent Tube and Cover
1
Gather the following:
•
T- 20 Torx screwdriver
•
9/16- inch wrench
2
Install the cover.
Single- wavelength detector:
a
Start the two screws on the right side of the cover.
b
Start and tighten the screws at the base on the left
side.
c
Tighten the screws on the right side.
Dual- wavelength detector: Install the cover (two screws).
3
Install the vent tube assembly.
4
Reconnect the flexible tubing to the vent tube assembly
and route the open end to waste.
5
Close the FPD cover.
Summary of Contents for Agilent 7890 Series
Page 1: ...Agilent Technologies Agilent 7890 Series Gas Chromatograph Maintaining Your GC ...
Page 28: ...28 Maintaining Your GC 3 Maintaining the GC ...
Page 74: ...74 Maintaining Your GC 6 Maintaining the Purged Packed Inlet 1 2 mm ...
Page 100: ...100 Maintaining Your GC 6 Maintaining the Purged Packed Inlet ...
Page 126: ...126 Maintaining Your GC 7 Maintaining the COC Inlet ...
Page 150: ...150 Maintaining Your GC 8 Maintaining the MMI ...
Page 176: ...176 Maintaining Your GC 9 Maintaining the PTV Inlet ...
Page 186: ...186 Maintaining Your GC 10 Maintaining the VI ...
Page 194: ...194 Maintaining Your GC 10 Maintaining the VI ...
Page 208: ...208 Maintaining Your GC 11 Maintaining the FID ...
Page 258: ...258 Maintaining Your GC 13 Maintaining the uECD ...
Page 271: ...Maintaining the NPD 14 Maintaining Your GC 271 ...
Page 288: ...288 Maintaining Your GC 14 Maintaining the NPD ...
Page 306: ...306 Maintaining Your GC 15 Maintaining the FPD ...
Page 328: ...328 Maintaining Your GC 17 Maintaining the Aux EPC ...
Page 334: ...334 Maintaining Your GC 18 Maintaining the PCM ...
Page 348: ...348 Maintaining Your GC 19 Maintaining a Valve ...
Page 353: ...Swagelok Connections 20 Maintaining Your GC 353 Figure 14 Completed fitting ...