3-2 ADS
Manual
Install the Sensors in the Pipe
This process primarily
includes assembling the ring (for standard installations) or
preparing the bands (for special installations) to which the
sensors attach, mounting the sensors to the ring or bands,
securing the sensor cables to the ring or band, and installing the
ring or bands in the pipe.
Secure and Connect the Cables
This procedure involves
securing the sensor cables from the ring or band to the monitor
location in the manhole and connecting the sensors to the
monitor. It also includes general instructions for
connecting a third-party water quality sampler to the monitor.
ULTRASONIC DEPTH SENSOR
PEAK COMBO SENSOR
MONITOR
FLOW
SURFACE COMBO SENSOR
OR
INSTALLATION
RING
TM
Typical
flow monitor and sensor installation
This chapter contains instructions for properly installing the sensors
in sanitary, storm, and combined sewer lines and manholes.
Note:
Manhole and sewer system work involves confined
space entry and is inherently dangerous. Therefore,
installers and technicians must comply with all federal,
state, and municipal regulations concerning confined space
entry. ADS is not responsible for any injuries, damages,
Summary of Contents for Intrinsically-Safe TRITON+
Page 19: ...1 12 ADS TRITON Manual Control Drawing ...
Page 25: ...1 18 ADS TRITON Manual First page of the TRITON ATEX Certificate ...
Page 27: ...1 20 ADS TRITON Manual First page of the TRITON IECEx Certificate of Conformity ...
Page 29: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 1 ...
Page 30: ...Introduction 1 23 CSA Certificate of Compliance Page 2 ...
Page 32: ...Introduction 1 25 Sample TRITON Declaration of Conformity Page 2 ...