Maintenance and Troubleshooting 11-45
problems will require a site visit. When this is necessary, inform
the data analyst any time a field crew is en route to a monitor site to
troubleshoot problems so that the analyst can attempt to collect the
monitor data before they arrive. If the problem is a faulty monitor
and the analyst cannot collect the data remotely, replace the
monitor and deliver the faulty monitor to the office so the analyst
can attempt to collect the data directly. Then, send the monitor to
ADS for repair.
This section provides general guidelines for troubleshooting and
correcting problems with the
monitor and sensor
subsystems.
General Monitor Problems
The following tables contain general troubleshooting techniques for
the
flow monitor.
Problem
Time stamp on the collected data is incorrect.
Possible
Causes
PC clock may have been set to incorrect time when the
monitor was activated.
Monitor time zone difference for the PC clock may not
have been set correctly when the monitor was activated.
Monitor clock may be faulty.
Possible
Solutions
Verify the time on the PC clock and correct if necessary.
Reactivate the monitor to enable the clock.
Verify the time
zone
setting of the monitor. Correct and
reactivate if necessary.
Collect the data from the monitor and replace monitor if
defective.
Summary of Contents for 507165
Page 20: ...1 12 ADS TRITON Manual Control Drawing ...
Page 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Page 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Page 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Page 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Page 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Page 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Page 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Page 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Page 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Page 53: ...System Overview 2 13 ExPAC XBUS ...
Page 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Page 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Page 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Page 358: ...Inclinometer 8 3 ...
Page 507: ...C 4 ADS TRITON Manual ...
Page 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...