11-14 ADS
Manual
Viewing 12-volt battery pack in monitor canister from top
7.
Place the top next to the canister, and then disconnect the
battery cable from the dome cable and set the top/power
regulator dome assembly aside.
However, do not disconnect
the battery cable while the monitor is awake (e.g., taking
readings or communicating)!
When the monitor is awake,
characters and lights display on the LED
STATUS
window.
Note:
Keep the underside of the top, the regulator dome,
and the top gasket free of dirt, mud, and other debris.
Debris and dirt can compromise the seal of the monitor
once it is reassembled. In addition, inspect the monitor
seal for damage.
Summary of Contents for 507165
Page 20: ...1 12 ADS TRITON Manual Control Drawing ...
Page 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Page 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Page 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Page 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Page 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Page 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Page 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Page 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Page 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Page 53: ...System Overview 2 13 ExPAC XBUS ...
Page 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Page 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Page 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Page 358: ...Inclinometer 8 3 ...
Page 507: ...C 4 ADS TRITON Manual ...
Page 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...