Operation principle..........................................................................374
Internal signals...........................................................................377
Run-time model..........................................................................378
Technical data.................................................................................379
Time synchronization............................................................................380
Time synchronization via SNTP......................................................380
Identification...............................................................................380
Settings.......................................................................................381
Time system, summer time begin DSTBEGIN................................381
Identification...............................................................................381
Settings.......................................................................................382
Time system, summer time ends DSTEND.....................................382
Identification...............................................................................382
Settings.......................................................................................383
Time zone from UTC TIMEZONE....................................................383
Time synchronization via IRIG-B.....................................................384
Operation principle..........................................................................384
General concepts.......................................................................384
Real-time clock (RTC) operation................................................386
Synchronization alternatives.......................................................387
Technical data.................................................................................388
Parameter setting group handling.........................................................388
Functionality....................................................................................388
Setting group handling SETGRPS..................................................389
Parameter setting groups ACTVGRP..............................................389
Identification...............................................................................389
Function block............................................................................389
Signals........................................................................................390
Table of contents
19
Technical Manual
Summary of Contents for REB650
Page 1: ...Relion 650 series Busbar protection REB650 ANSI Technical Manual ...
Page 2: ......
Page 34: ...28 ...
Page 52: ...46 ...
Page 128: ...122 ...
Page 150: ...144 ...
Page 192: ...186 ...
Page 222: ...216 ...
Page 360: ...354 ...
Page 378: ...372 ...
Page 437: ...IEC12000585 V1 EN 1MRK 505 277 UUS C Section 16 IED physical connections 431 Technical Manual ...
Page 438: ...IEC12000586 V1 EN Section 16 1MRK 505 277 UUS C IED physical connections 432 Technical Manual ...
Page 439: ...IEC12000587 V1 EN 1MRK 505 277 UUS C Section 16 IED physical connections 433 Technical Manual ...
Page 440: ...IEC12000588 V1 EN Section 16 1MRK 505 277 UUS C IED physical connections 434 Technical Manual ...
Page 441: ...IEC12000589 V1 EN 1MRK 505 277 UUS C Section 16 IED physical connections 435 Technical Manual ...
Page 442: ...IEC12000590 V1 EN Section 16 1MRK 505 277 UUS C IED physical connections 436 Technical Manual ...
Page 443: ...IEC12000591 V1 EN 1MRK 505 277 UUS C Section 16 IED physical connections 437 Technical Manual ...
Page 444: ...IEC12000592 V1 EN Section 16 1MRK 505 277 UUS C IED physical connections 438 Technical Manual ...
Page 454: ...448 ...
Page 503: ...497 ...