1-2
Configuring Monitor Link
Configuration Prerequisites
Before assigning a port to a monitor link group, make sure the port is not the member port of any
aggregation group or service loopback group.
Configuration Procedure
Follow these steps to configure monitor link:
To do…
Use the command…
Remarks
Enter system view
system-view
—
Create a monitor link group and enter
monitor link group view
monitor-link group
group-id
Required
In monitor link
group view
port
interface-type
interface-number
uplink
Configure the
uplink for the
monitor link group
In Ethernet port
view or Layer 2
aggregate
interface view
port monitor-link group
group-id uplink
Use either approach
Repeat this step to
add more uplink ports
In monitor link
group view
port
interface-type
interface-number
downlink
Configure the
downlink for the
monitor link group
In Ethernet port
view or Layer 2
aggregate
interface view
port monitor-link group
group-id downlink
Use either approach
Repeat this step to
add more downlink
ports
z
A port can be assigned to only one monitor link group.
z
You are recommended to configure uplink ports prior to downlink ports, thus avoiding undesired
down/up state changes on the downlink ports.
Monitor Link Configuration Example
Network requirements
GigabitEthernet 2/0/1 and GigabitEthernet 2/0/2 of a device are up. Configure GigabitEthernet 2/0/2 to
change its up/down state as GigabitEthernet 2/0/1.
Configuration procedure
<Sysname> system-view
[Sysname] monitor-link group 1
[Sysname-mtlk-group1] port gigabitethernet 2/0/1 uplink
Summary of Contents for S7902E
Page 82: ...1 4 DeviceA interface tunnel 1 DeviceA Tunnel1 service loopback group 1 ...
Page 200: ...1 11 DeviceB display vlan dynamic No dynamic vlans exist ...
Page 598: ...ii ...
Page 1757: ...4 9 ...
Page 1770: ...6 4 ...
Page 2017: ...2 11 Figure 2 3 SFTP client interface ...
Page 2238: ...1 16 DeviceA cfd linktrace service instance 1 mep 1001 target mep 4002 ...