![YOKOGAWA Vigilant Plant EXA TB Series Скачать руководство пользователя страница 113](http://html1.mh-extra.com/html/yokogawa/vigilant-plant-exa-tb-series/vigilant-plant-exa-tb-series_user-manual_4095614113.webp)
<7. MAINTENANCE>
7-10
IM 12E04A02-02E
O-ring
Knob of the air vent
Filter element
Case
Turn to remove.
F0706.ai
Figure 7.5 Replacement of Zero Filter
7.10 Replacement of Fuses
For preventive maintenance, it is recommended that the fuses be replaced each with a new one
after a period of one year.
As there are both 1A and 3A fuses, do not mix them up.
1. Turn off the power switch.
2. Remove the caps of the fuse holders on the front panel of the converter (turn
counterclockwise) (see Figure 7.6).
3. Replace the fuses.
4. Close the caps; now the procedure is completed.
5. Finished.
POWER
FUSE 1A
FUSE
FUSE
FUSE 3A
ON
OFF
FUNC
ENT
SV4
SV3
2
RATION
M1
M2
G
L1
L2
V1
V2
V3
V4
V5
V8
7
V9
V10
V11 V12
2
Fuse (1A)
Fuse (3A)
F0707.ai
Figure 7.6 Replacement of Fuses
3rd Edition : May. 31, 2010-00
Содержание Vigilant Plant EXA TB Series
Страница 49: ...Blank Page ...
Страница 59: ...Blank Page ...
Страница 119: ...Blank Page ...
Страница 125: ...Blank Page ...
Страница 127: ...Blank Page ...
Страница 133: ...Blank Page ...