< 4. Piping >
4-5
IM 11M12D01-01E
4.1.5 Piping for Blow back
This piping is required when the blow back function is carried out. The piping described below
provides automatic blow back operation when the “ blow back start “ command is entered to the
converter.
Pipe coupling
Blow pipe
Blow back air
Reducing valve
F4-6.ai
Solenoid valve
Solenoid valve
If blow back is done under
control of a contact output
from the averaging converter,
a hold is placed on analog
output signals from all detector
while blow back is in progress.
See Section 10.5 for details on
the blow back function. Wiring
for solenoid valves is described
in Section 5.3.
Note
Figure 4.6 Blow back Piping
The following parts are required for blow back piping.
• Blow pipe (to be prepared as illustrated in Figure 4.7.)
• Two-way solenoid valve: “ Open “ when electric current is on. (Found on the local market)
• Air set (Yokogawa recommended: G7003XF / K9473XK or G7004XF / K9473XG)
<Blow pipe manufacturing>
Manufacture the blow pipe as illustrated in Figure 4.7, and mount it on the high temperature probe
adapter.
Approximately
200
Rc1/4
Blind flange of the
high temperature probe adapter
Welded
Unit : mm
8 (O.D.) by 6 (I.D.) Stainless steel pipe
F4-7E.ai
8 ~ 10
Φ
90
Φ
73
4-
Φ
9
Figure 4.7 Blow pipe Construction
Содержание av550g
Страница 17: ...Blank Page ...
Страница 45: ...Blank Page ...
Страница 71: ...Blank Page ...
Страница 203: ......
Страница 205: ......
Страница 207: ......
Страница 209: ......
Страница 211: ......
Страница 213: ...Blank Page ...