3-13
INSP
ADJ
E
POWER UNIT/
POWER TRIM AND TILT (PTT) SYSTEM
14. Loosen:
●
Timing belt tensioner
15. Remove:
●
Driven sprockets
●
Timing belt
16. Tighten:
●
Timing belt tensioner
17. Install:
●
Cylinder head cover
●
Driven sprockets
●
Timing belt
●
Spark plugs
18. Connect:
●
Fuel hoses
●
Spark plug leads
19. Install:
●
Spark plug cap cover
●
Flywheel magneto cover
POWER TRIM AND TILT (PTT) SYSTEM
PTT fluid
WARNING
To prevent the PTT fluid from spurting out
due to internal pressure, the outboard
should be kept fully tilted up (the tilt rod at
full length) while slowly removing the plug
screw.
1. Check:
●
PTT fluid level
Low
→
Add fluid to the proper level.
2. Fill:
●
PTT unit
Checking steps:
●
Tilt up the outboard and lock it with
the tilt support lever.
●
Remove the reservoir plug.
●
Check that the fluid level is directly
below the reservoir plug hole.
Recommended PTT fluid:
ATF Dexron
II
Содержание F100A
Страница 51: ...F D ES SPEC 2 9 DIMENSIONS ABMESSUNGEN DIMENSIONES DIMENSIONS ABMESSUNGEN DIMENSIONES 9 ...
Страница 58: ...2 13 SPEC E HOSE ROUTING HOSE ROUTING 2 1 3 1 Water hose 2 Blow by gas hose 3 Oil return hose ...
Страница 116: ...4 6 FUEL E FUEL PUMPS SERVICE POINTS Fuel pump inspection 1 Inspect Diaphragms Damage Replace any defective part ...
Страница 394: ...8 4 ELEC E ELECTRICAL COMPONENTS Rear view 1 2 1 Spark plug 2 Spark plug lead ...
Страница 450: ...E 1 2 3 4 5 6 7 8 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 462: ......
Страница 463: ...Printed on recycled paper Printed in Japan Oct 2000 0 2 1 CR F100AET YAMAHA MOTOR CO LTD ...