7-38
E
BRKT
PTT UNIT
PTT UNIT
SERVICE POINTS
PTT fluid filling
1. Fill:
●
Reservoir
NOTE:
Fully extend the tilt rod when filling the res-
ervoir with the fluid.
2. Install:
●
Reservoir plug
Recommended PTT fluid:
ATF Dexron
II
T
R
.
.
Reservoir plug:
7.0 Nm (0.7 m • kg, 5.2 ft • lb)
Air bleeding
1. Bleed:
●
PTT unit
Bleeding steps:
●
Close the manual valve by turning it
clockwise.
●
Set the PTT unit upright.
●
Connect the PTT motor leads to the
battery.
Tilt rod
PTT motor
lead
Battery
terminal
Up
Blue
+
Green
-
●
Remove the reservoir plug and make
sure the PTT fluid is up to the brim of
the reservoir plug hole. If the PTT fluid
is below the brim of the reservoir plug
hole, add fluid until it is to the proper
level.
●
Install the reservoir plug.
●
Connect the PTT motor leads to the
battery.
Tilt rod
PTT motor
lead
Battery
terminal
Down
Green
+
Blue
-
G (L)
L (G)
Содержание F100A
Страница 51: ...F D ES SPEC 2 9 DIMENSIONS ABMESSUNGEN DIMENSIONES DIMENSIONS ABMESSUNGEN DIMENSIONES 9 ...
Страница 58: ...2 13 SPEC E HOSE ROUTING HOSE ROUTING 2 1 3 1 Water hose 2 Blow by gas hose 3 Oil return hose ...
Страница 116: ...4 6 FUEL E FUEL PUMPS SERVICE POINTS Fuel pump inspection 1 Inspect Diaphragms Damage Replace any defective part ...
Страница 394: ...8 4 ELEC E ELECTRICAL COMPONENTS Rear view 1 2 1 Spark plug 2 Spark plug lead ...
Страница 450: ...E 1 2 3 4 5 6 7 8 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 462: ......
Страница 463: ...Printed on recycled paper Printed in Japan Oct 2000 0 2 1 CR F100AET YAMAHA MOTOR CO LTD ...