5-18
E
POWR
CYLINDER HEAD COVER
CYLINDER HEAD COVER
EXPLODED DIAGRAM
17 Nm (1.7 m
•
kg, 12 ft
•
Ib)
2 Nm (0.2 m
•
kg, 1.4 ft
•
Ib)
7
×
48 mm
4
×
8 mm
7
8
5
4
6
2
1
9
10
3
E
M
LT
LT
572
572
M
8 Nm (0.8 m
•
kg, 5.8 ft
•
Ib)
6
×
30 mm
4
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
CYLINDER HEAD COVER
REMOVAL
Follow the left “Step” for removal.
Timing belt and driven sprockets
Refer to “TIMING BELT”.
1
Clip
1
2
Breather hose
1
3
Oil filler cap
1
4
Bolt
14
5
Cylinder head cover
1
6
Rubber gasket
1
Содержание F100A
Страница 51: ...F D ES SPEC 2 9 DIMENSIONS ABMESSUNGEN DIMENSIONES DIMENSIONS ABMESSUNGEN DIMENSIONES 9 ...
Страница 58: ...2 13 SPEC E HOSE ROUTING HOSE ROUTING 2 1 3 1 Water hose 2 Blow by gas hose 3 Oil return hose ...
Страница 116: ...4 6 FUEL E FUEL PUMPS SERVICE POINTS Fuel pump inspection 1 Inspect Diaphragms Damage Replace any defective part ...
Страница 394: ...8 4 ELEC E ELECTRICAL COMPONENTS Rear view 1 2 1 Spark plug 2 Spark plug lead ...
Страница 450: ...E 1 2 3 4 5 6 7 8 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 462: ......
Страница 463: ...Printed on recycled paper Printed in Japan Oct 2000 0 2 1 CR F100AET YAMAHA MOTOR CO LTD ...